Meter changeovers for solar installers
Meter changeovers are holding up your projects. Here's how SolReady and Intellihub streamline the process so you can keep installations moving.
Meter changeovers do not need to slow your projects down.
If you’re installing SolShare projects in NSW, it's likely you've experienced delays due to meter changeovers.
Missing NMIs, incomplete resident details, retailer coordination and timing updates can all impact installation timelines.
Collect resident NMIs upfront
We provide you with a secure form to share with residents to collect the info needed for their meter upgrade and solar connection.
Improve project visibility
Intellihub assesses each site to identify potential roadblocks and works with you to mitigate them.
Keep projects moving
Intellihub coordinates the meter exchange process with each retailer and keeps you up to date via a dedicated portal.
What installers are saying
"The meter changeover process with Anila from Intellihub, using SolReady, has always been super easy. They take care of everything and provide regular updates throughout the process. The best part is the reduced paperwork, which allows us to spend more time focusing on client-facing work and installation. This saves us time and ultimately means we can get solar solutions up and running faster for our clients."
“Even 'easy' solar admin is time-consuming, but having Intellihub available to spearhead the meter changeovers has been a huge burden lifted. Intellihub really has been a game-changer for Solahart. ”
How to initiate a solar meter exchange with Intellihub
The process is straightforward, and we can help you get started.
Step 1: Confirm
At your site visit, confirm whether a meter exchange is needed. If so, submit the grid application and wait for approval. If existing smart meters are already in place, forms may need to be completed directly with the energy retailer.
Step 2: Engage
Reach out to us to initiate the process. We’ll set you up in the system and facilitate an email introduction to Intellihub, who will coordinate the meter exchange.
Step 2: Engage
Step 3: Access
You’ll receive access to a dedicated portal, where you can manage and monitor meter changeovers. Once access is granted, you can begin collecting site and resident information.
Step 4: Coordinate
Intellihub will initiate the meter exchange with the retailer using the information provided, coordinate the exchange and update all timing information in the portal. Meter exchange cannot proceed without grid application approval.
Step 4: Coordinate
Step 5: Activate
Once the meter exchange is finalised, Intellihub will notify you and update the relevant information in the portal.
Meter exchange complete!
The solar system can now be turned on.
Still have questions?
We’ve covered the key details about getting set up with Intellihub, coordinating meter exchanges and using SolReady to collect resident information.While not required, if a meter exchange is needed, SolReady helps collect the resident and site information needed to support the Intellihub process. It is a simple way to reduce the risk of delays later in the project.
Residents are asked to provide essential details needed for their meter upgrade and solar connection, including their NMI. Our SolReady form includes guidance for residents to help them find their NMI.
Yes. The SolReady process is free for SolShare installation partners.
No. The meter exchange process cannot happen without grid application approval.
If existing smart meters are already in place, forms may need to be completed directly with the energy retailer.